SIS and emergency shutdown
Integration of instrumentation, logic and final elements for protective functions defined by safety engineering. Signals, trip conditions and interlocks are reviewed with the installation's responsible personnel.

04 / DYSCO EP SERVICES
Engineering, supply, installation and maintenance of safety instrumented systems, emergency shutdown and fire and gas detection. Functional testing and commissioning are defined for each installation.
REFERENCE DATA / U.S. EIA


Open the panel to view the data.
Published daily reference, not a real-time quote. Check the date of each value.
SCOPE / FUNCTIONAL SAFETY / SIS
We integrate detection, logic, alarms and protective elements. Interventions are based on required functions, approved procedures and the site's operating conditions.

Integration of instrumentation, logic and final elements for protective functions defined by safety engineering. Signals, trip conditions and interlocks are reviewed with the installation's responsible personnel.

Supply and integration of UV/IR detection, combustible and toxic gas detection, visual and audible alarms and suppression systems as specified. Equipment selection, location and interfaces with existing protection are validated.

Set-point, signal-path and functionality tests; diagnostics and maintenance of existing systems. Execution requires authorized procedures, permits and coordination with operations.
Engineering, supply, installation, commissioning, operation and maintenance.
IEC 61511 addresses SIS in process industries from specification through operation and maintenance; IEC 61508 provides the general functional safety framework. Required functions and integrity levels are determined and verified using project studies and documentation.
Test procedures, intervention conditions, bypass management and system reinstatement are defined with the operator. Records document results, deviations and outstanding items as evidence of activities completed within the contracted scope.
cloudLOGGER SCADA can integrate states, events and maintenance records through authorized interfaces. Monitoring and notifications do not replace protective logic, SIS tests or independence requirements.
Applicable standards and editions are defined in the engineering and contracted scope. Referencing a standard does not certify the company, equipment or installation.
FREQUENTLY ASKED QUESTIONS
The scope may include engineering, integration of logic, instrumentation and protection elements, as well as functional testing.
We integrate fire and gas detection and its signaling or connection to the site's protection systems.
We diagnose and perform functional and loop testing to assess existing systems according to the agreed procedure and scope.
Process control regulates operation. An SIS executes protection functions defined by safety engineering when specified conditions occur. Its design and verification require a dedicated scope.
No. Integrity requirements and safety functions must be defined and verified using the information and studies applicable to the process. A commercial description does not replace that assessment.
Documentation, functions, operating conditions and test procedures are reviewed with the site representative. Activities are coordinated and authorized before work begins.
IEC 61511 and IEC 61508 are functional safety references. Their application, safety instrumented functions and required integrity are established through project studies and documentation. No SIL rating is assigned to an entire installation or SCADA system by default.
The integration described is for monitoring states, events and records. The SIS retains its protective logic and independence requirements; a cloudLOGGER alarm or notification does not replace a safety instrumented function.
THE NEXT STEP / LET'S TALK
Let us review your equipment, variables and requirements for SCADA, automation, instrumentation, safety or measurement.
TALK TO OUR TEAMWhatsApp→Tamaulipas 407 · Col. Petrolera
ZIP 96500 · Veracruz, Mexico