
Coriolis and ultrasonic meters
Design, supply, installation, diagnostics and maintenance of measurement systems. Selection and verification consider the fluid, operating conditions, installation and metrological requirements of the metering point.

05 / DYSCO EP SERVICES
Engineering, supply, installation, FAT/OSAT, commissioning, operation and maintenance of measurement systems. We integrate meters, flow computers and measurement management through cloudLOGGER SCADA.
REFERENCE DATA / U.S. EIA


Open the panel to view the data.
Published daily reference, not a real-time quote. Check the date of each value.
SCOPE / MEASUREMENT AND CUSTODY TRANSFER
Hydrocarbon and gas metering points using Coriolis, ultrasonic technology and flow computers. We review the measurement chain, configuration, communications and documentation for current and legacy equipment.

Design, supply, installation, diagnostics and maintenance of measurement systems. Selection and verification consider the fluid, operating conditions, installation and metrological requirements of the metering point.

Configuration, testing and integration of signals, parameters and records. Documented experience with OMNI, ABB and Emerson, considering versions, documentation and compatibility before changing the system.

We implement a Measurement Management System in cloudLOGGER SCADA with reference to ISO 10012: instrument inventory, certificates, confirmations and metrological events linked to operations and maintenance.
Engineering, supply, installation, commissioning, operation and maintenance.
We define equipment, signals, configuration and measurement system tests. Units, parameters, communications and records are checked against approved documentation. Commissioning, operation and maintenance are included with specific activities and acceptance criteria.
The metrological control module organizes calibration certificates, confirmations, installations, relocations, maintenance and failures. We link monitoring data with asset records to support traceability and documentary review of the Measurement Management System.
API MPMS brings together petroleum measurement standards; relevant chapters depend on the fluid, technology and transfer operation. ISO 10012 provides a measurement management framework. Technical, contractual and regulatory requirements are reviewed for each point: having SCADA does not certify the measurement.
Applicable standards and editions are defined in the engineering and contracted scope. Referencing a standard does not certify the company, equipment or installation.
FREQUENTLY ASKED QUESTIONS
We work with ultrasonic and Coriolis meters and flow computers, according to installed equipment and technical scope.
Yes. We define communication and information integration with the available supervisory platform or cloudLOGGER.
The scope may include design, integration, testing, commissioning and maintenance; each stage is agreed with the client before work begins.
Depending on the application, checks cover input signals, units, configuration parameters, communications and records, using the documentation and agreed technical scope.
SCADA monitoring alone does not replace the Measurement Management System. The cloudLOGGER metrology module organizes assets, certificates and events and is implemented alongside procedures, verifications and responsibilities with reference to ISO 10012.
Share the fluid type, installed meters and flow computers, variables, communications and review objective. This information defines the diagnostic scope and service deliverables.
Equipment inventory, calibration certificates, confirmations and metrological events are organized alongside installations, relocations and maintenance. Implementation is linked to management system procedures and responsibilities with reference to ISO 10012.
That depends on the fluid, technology and contractual conditions at the metering point. We review relevant API MPMS chapters, ISO 10012 measurement management requirements and applicable regulation. There is no single configuration suitable for every metering point.
THE NEXT STEP / LET'S TALK
Let us review your equipment, variables and requirements for SCADA, automation, instrumentation, safety or measurement.
TALK TO OUR TEAMWhatsApp→Tamaulipas 407 · Col. Petrolera
ZIP 96500 · Veracruz, Mexico